top of page

STAGE 6 - Changes to the building warrant design

Approved Certifiers of Design – Application and granting of building warrant

START: Prepare and issue a Certificate of Design with the necessary drawings to the customer that will accompany their building warrant application. It is important that the description provided on the certificate of design is accurate and consistent with the description on the application for building warrant, and covers all the work on the application for building warrant.

For Certification of Design work, it may also be necessary to provide the customer with a
Schedule 1 form detailing any design components that the certificate does not cover at this stage (for example, if a specialist subcontractor is needed for a particular structural element).

Once the
Schedule 1 items relating to the warrant have been finalised, provide the customer with a completed Finalisation Notice – Form Q. If the items have not been finalised Form Q should not be issued.
 

bottom of page