STAGE 7 - Building work (or conversion) is complete

Procedure
 

- Form 5 – Completion Submission

Structure

- Form Q

- Roof Truss

- Certificate Wall ties/structural restraint inspection report

Fire

- Fire detection and alarm

- Certificate Automatic fire suppression system Commissioning Certificate

- Emergency Lighting Certificate Fire/smoke dampers commissioning Certificate

- Smoke ventilation system commissioning Certificate

- Smoke Curtain Drop Test and Commissioning

- Intumescent paint/cladding Certificate

- Fire door installation inspection report

- Fire Rated Glazing and Framing Certificate

- Fire stopping inspection report

- Dry Fire Main Commissioning Certificate

- Fire Safety Design Summary

Environment

- Certificate of Construction (Plumb/Heat/Drain)

- Boiler Commission Certificate

- Gas Safety Information

- Unvented Hot Water Competence

- MVHR/MEV/dMEV Commissioning Certificate

- Scottish Water/SEPA Approval

- Drain Test inspection reports (in addition to any actual tests by the verifier)

Safety

- Certificate of Construction (Electrics)

- Electrical installation test Certificate – BS7671

- Lift Commissioning Certificate

- Evidence of Safety Glass Fitted

Noise

- Noise Test Certificate

Energy

- EPC

- Air Tightness Test Certificate

- Quick start guide (domestic)

- Logbook information (non-domestic)

Sustainability

- Sustainability Label